On April 8-10, the China international exhibition on power equipment and power generation unit was held at Shanghai new international expo center, the exhibition on wood company to H, D, E, G four series mainly
The adjustment technology improvement of DF4B locomotive diesel generator assembly vehicle, Zhao Weining (Hangzhou locomotive depot Zhejiang Hangzhou B10008) loading adjustment process, the process has achieved good results in practical application.
The application of Zhang Jinjiao system in PLC Journal of Hubei Institute of technology in the automatic control of diesel generator, Chen Gang (Department of mechanical engineering
The phase compensation reactor inductance component test and generator capacitive current in opposite phase, offset in part by test of capacitive current, make the total current test circuit in test equipment is reduced, the capacity is reduced.